Being proud of completing the design, manufacturing, installation and commissioning processes of a 17 MW mono-block dual fuel (NG, LPG) burner, and the whole control system (Electrical modular operation on burner in addition to full control on boiler’s FW, TDB, WLC, BBD) on a 20 TPH/20 bar single furnace firetube three-pass steam boiler in Oman.
Special thanks to Hamed Bagherian and our dedicated service team member for their exceptional work on completing the process under such challenging warm and humid weather conditions,” said Vahid Azizi, manager of raadman burner factory.